How to install and debug the belt conveyor

The belt conveyor has become an indispensable logistics conveying equipment in the operation of the production line by virtue of its simple structure, easy maintenance, low energy consumption and low cost of use. This article describes how to install and commission a belt conveyor.

    The belt conveyor is a conveying device with large conveying capacity , low operating cost and wide application range . The machine is suitable for conveying bulk materials or pieces of objects . It can be transported by single machine according to the requirements of the conveying process , or it can be multiple or other Conveying equipment consists of horizontal or inclined conveyor systems. Let's take a look at how to install and debug the belt conveyor?

First, the steps to install the belt conveyor:
   
Belt conveyors are generally shipped as finished units. Avoid collision when loading and unloading, and pay attention to avoid deformation of parts when lifting. Pay attention to the following aspects when installing the belt conveyor.
( 1 ) Units containing transmission parts are generally required to be packed at the time of shipment. Avoid bumping when unpacking. For heavily soiled transmission parts, clean the belt conveyor before installing it.

( 2 ) When installing the belt conveyor, follow the drawing requirements, and the moving parts should be flexible. Each tensioning device is adjusted to the appropriate degree according to requirements.

( 3 ) Storage and transportation of equipment in summer, transportation should be protected against rain, and parts should be avoided from direct contact with rain.

( 4 ) Installation of belt conveyors generally does not require pre-buried. The equipment is fixed by expansion bolts, and the height of the equipment feet can be adjusted, so there is no special requirement for the ground. The design unit provides the foot release and foot load distribution map, and the civil construction part is constructed on the ground as required.

( 5 ) When installing the belt conveyor, draw the center line of each equipment on the ground according to the size requirements of the general drawing. The center line must be consistent with the center line of the related equipment. The equipment is installed according to the line, and the ground feet are tight with expansion bolts. solid.

( 6 ) Adjust the elevation, straightness and level of each conveying surface according to the requirements of the drawings.

( 7 ) Lay the electrical tank (tube).

( 8 ) Install the power distribution cabinet (box), wiring, etc.

Second, the steps to debug the belt conveyor:
( 1 ) After the installation of each equipment, carefully adjust the belt conveyor to meet the requirements of the drawings.
( 2 ) Each reducer and moving parts are filled with the corresponding lubricating oil.

( 3 ) After the installation of the belt conveyor meets the requirements, each single equipment is manually tested, and the belt conveyor is combined to meet the requirements of the operation.

( 4 ) Debug the electrical part of the belt conveyor. Including the debugging of conventional electrical wiring and actions, so that the equipment has good performance and achieves the designed function and state.