Analysis of correct operation rules of high pressure homogenizer
Baby Squid ZHEJIANG EVERNEW SEAFOOD CO.,LTD , https://www.evernewseafood.com
1. Before starting the equipment, check whether the fastening part of the transmission part and the pump body are tightened. Move the large pulley by hand to check whether the transmission part is stuck or loose. Check whether the oil is added to the connecting rod oil hole in the transmission box. Above 1-2cm, turn on the cooling water on the plunger and turn on the power switch.
2. Open the valve on the feed pipe. It is forbidden to start the motor before the valve on the pipe is opened.
3. After running for a period of time after the feed is deflated, confirm that everything is normal before entering the production run.
4. The pressure of the pump should be gradually increased. First, adjust the secondary pressure to 10Mpa, and then adjust the primary pressure to the pressure required for production, but the pressure should not exceed 28Mpa.
5. When carrying out load operation, the short-term zui pressure should not exceed 10% of the rated value of 28Mpa.
6. During the operation of the high-pressure homogenizer , it is necessary to check the temperature of each part of the bearing, bearing bush and fuel tank, the oil level, the leakage of the seal ring and the jump of the pointer of the pressure gauge, and the abnormal situation is immediately stopped for maintenance.
7. Before parking, first loosen the first pressure adjustment handle, then loosen the secondary pressure adjustment handle to reduce the pressure, and then close the valve on the feeding pipeline after stopping.
8. Immediately after the pump stops production, clean the pump body, turn off the cooling water on the plunger, and turn off the power switch.